MS Theresia
MS Theresia has soil below and from above, renewed
At the end of August, ms Theresia has been put dry in Dodewaard to renew the surface of the front and rear hold.
Thereafter, the ship has come to Druten to lay an entirely new steel floor of Raex 400, 8 mm thick.